Posted by PP小狂人 on 2008-06-03 05:20 下午
|
Anybody can tell me the difference between basic scheduling and lead time scheduling? Thanks lot!
|
|
|
Posted by lgzly on 2008-06-04 05:40 下午
|
basic scheduling排程精确到天,不考虑产能;Lead time scheduling排程精确到分\秒,考虑有限能力
|
|
|
Posted by PP小狂人 on 2008-06-05 09:57 上午
|
lgzly wrote: | basic scheduling排程精确到天,不考虑产能;Lead time scheduling排程精确到分\秒,考虑有限能力 |
|
这个难道跟APO中的finite planning 和infinite planning 一样吗?
|
|