  ps-09-Organizational Assignments in the Project System
帖子发起人: tonybaby   发起时间: 2006-07-11 11:03 上午   回复数: 0
? 上一主题 下一主题 ?
楼主
  2006-07-11, 11:03 上午
tonybaby 离线,最后访问时间: 2007/12/18 8:25:37 tonybaby

发帖数前200位

40级
等级: 40级
注册: 2006年5月8日
经验: 144
积分: -2
精华: 0
发贴: 85
排名: 173
Site Registered Users
ps-09-Organizational Assignments in the Project System
 
Organizational Assignments in the Project System 

Use

The following gives you an overview of the organizational assignments in the project definition, WBS elements, network headers, network activities (and activity elements), and material components. The table shows the dependencies which exist between individual organizational units, where the default values come from, and whether and under what circumstances values can be changed.

The WBS elements belonging to a project definition, along with assigned networks and network activities, must be assigned to the controlling area for the project definition. In the same way, network activities and subnetworks must be assigned to the controlling area in the header for the network to which they belong. The company code(s) and business area in the WBS elements, networks, and network activities must be in the controlling area for the project definition and/or network header.

Project Definition

The values for the project definition are copy from the template or project profile when you create a work breakdown structure. If you create a work breakdown structure using a template but enter a project profile different from the one in the template, you can choose whether to adopt the default values from the template or those from the project profile.

If you make later changes to the project profile, the changes have no effect on the values taken from the project profile and inserted into existing project definitions.

Controlling Area

Type of field

Required

Default value

Inherited by any new elements your create or insert into the WBS.

Can be changed?

Yes, but only when you are creating the project definition. Once you have saved, you cannot change the controlling area (exception: standard WBS).

(Object) Currency

Type of field

Required

Default value

Default value for new WBS elements

If you do not fill this field, the system copies the company code into it.

Can be changed?

Only if the controlling area does not allow different company code currencies.

Company Code

Type of field

Required

Business area

Type of field

Required field, if business area balances are managed in the company code.

Profit Center

Type of field

Optional

Plant

Type of field

Optional

 

WBS Element

When you create new WBS elements or incorporate them into a WBS, the values from the project definition are copied into the WBS elements.

If you change the project definition later, the changes have no effect on the values taken from the project definition and inserted into existing WBS elements.

Controlling Area

Type of field

Display

Can be changed?

No

(Object) Currency

Type of field

Required

Default value

When you create or incorporate new WBS elements, the value is taken from the project definition or derived from the company code in the WBS elements.

Can be changed?

Only if the controlling area does not allow different company code currencies and if no plan/actual values, commitments, or budget exist for the WBS element.

Company Code

Type of field

Required

Operating conditions/check

The company code must belong to the assigned controlling area.

Can be changed?

Different WBS elements can be assigned to different company codes.

You cannot change the company code if plan/actual values, commitments, or budget exist.

Business Area

Type of field

Required, if business area balances are managed in the company code.

Can be changed?

You cannot change the business area if plan/actual values, commitments, or budget exist.

Profit Center

Type of field

Optional

Plant

Type of field

Optional

Operating conditions/check

The plant must belong to the assigned company code.

 

Further Dependencies

Statistical Key Figure

Type of field

Optional

Default value

When you create new WBS elements, the value is taken from the project definition.

When you use a existing WBS elements as a template to incorporate new WBS elements, the system takes the value from the template.

Can be changed?

You cannot change the statistical key figure if plan or actual values exist.

Integrated Planning Indicator

Type of field

Optional

Default value

When you create or incorporate new WBS elements, the value is taken from the project definition.

When you create a new WBS using a template, the system takes the value from the template.

Can be changed?

Yes, until plan or actual values exist.

Object Class

Type of field

Required value for new WBS elements

Default value

When you create new WBS elements, the system takes the value from the project definition.

When you use a existing WBS elements as a template to incorporate new WBS elements, the system takes the value from the template.

Can be changed?

Yes, until plan or actual values exist.

 

 

Network Header

Controlling Area

Type of field

Display

Default value

Inherited by activities and activity elements.

Can be changed?

No; determined when the plant is created.

Company Code

Type of field

Display

Default value

Inherited as default value by new activities and activity elements.

Operating conditions/check

The company code must belong to the assigned controlling area.

Can be changed?

No; determined when the plant is created.

(Object) Currency

Type of field

Required

Can be changed?

Yes, until the network is released in whole or in part, provided the controlling area does not permit different company code currencies.

If it does, no changes are permitted. In such cases, the currency is taken from the assigned company code.

 

Activities/Activity Elements in Header-Assigned Networks

The controlling area and company code are copied from the network header to the activity or activity element.

Activities/Activity Elements in Activity-Assigned Networks

Plant

Type of field

Required

Default value

Default for components

Operating conditions/check

Must belong to the controlling area for the network header.

Can be changed?

Yes, but only within the company code and then not until (actual) costs or commitments exist for the activity.

Controlling Area

Can be changed?

No. Always the same as the controlling area in the network header.

Company Code

Type of field

Display

Default value

Determined from the plant.

Can be changed?

No

Object Currency

Type of field

Required

Default value

The default value is the currency of the company code derived from the plant.

Can be changed?

Yes, until the network is released in whole or in part, provided the controlling area does not permit different company code currencies.

If it does, no changes are permitted. In such cases, the currency is taken from the assigned company code.

 

Material Component

Plant

Type of field

Required

Default value

Default value from activity

Operating conditions/check

Any material specified must have a material master in this plant.

Can be changed?

No


分享按钮 IP 地址: 已登录   来自: 已登录    返回顶部
 第 1 页 总共 1 页 [共有 1 条记录]
ERP俱乐部 -> SAP专栏 -> PS(项目系统) -> ps-09-Organizational Assignments in the Project System
(C)Copyright 2005-2020 www.erpclub.org All Rights Reserved.
Tel:+86-755-26444630
Email:webmaster@yok.com.cn