再次触发审批策略是可以的,按我的理解,就是"用来判断使用那个审核的条件"如果更改过或价格更改过(如:我们经常使用文件类型进行判断,假设你改过文件类型,则审批策略一定不同),则一定会触发审批策略. 查了一下帮忙,系统说到:我们可以控制到审核后不可以更改这张PR,也可以允许更改,只是更改后,针对"加价"的情况,可以设一个percentage,而减价是不需要的. 下面是我查到的Help,自己啃吧,我不懂EN,不知道他说啥子. ******************************************************************************************** Specifies the percentage by which the value of the requisition may be increased (as a result of a change to the requisition) after the release procedure has begun. Use By specifying a percentage for changes in value, you can ensure that a requisition cannot be changed significantly after having been released. If the requisition is then changed, and the new value exceeds the old value by more than the percentage entered, the system issues an error message. The user can: - Adjust the amount of the change so that the percentage value is not exceeded
The release procedure continues from its current point. - Leave the change as it is (disregarding the system message)
The release procedure is re-started from the beginning. Dependencies The system only checks changes in the value of a requisition if the Changeability indicator is set to "4 - Changeable, new release procedure if strategy or value changed" for the release indicator Customizing.
************ 天 高 云 淡 我 心 飞 翔 MSN:szjin@tom.com 打造最强势内部团队. ************
|